Lionel 6-30020 North Pole Central Christmas Train Set O-Gauge Ready to Run - NIB
Lionel
New with factory defects. See pictures for details. A complete Lionel Ready to Run Christmas train set built around a 4-4-2 steam locomotive and tender, done up in North Pole Central holiday colors. This is the conventional control version, meaning it runs on any standard transformer with forward, neutral, and reverse control. The set appears factory sealed in original shrink wrap, never opened. Included Components SET INCLUDES 4-4-2 steam locomotive and tender Christmas music boxcar, plays 12 Christmas carols Elf and reindeer animated gondola Lighted caboose Eight curved FasTrack sections Three straight FasTrack sections One FasTrack terminal section PowerMax transformer Smoke fluid Locomotive Specifications LOCOMOTIVE FEATURES Realistic air whistle in the tender Operating headlight Operating coupler on rear of tender Powerful maintenance free motor Traction tire Puffing smoke unit Die cast metal locomotive body Rolling Stock Details ROLLING STOCK FEATURES Operating couplers Features and Functions Musical boxcar plays 12 Christmas carols, runs on a 9 volt battery, not included Elf and reindeer figures move around the gondola while the train is in motion Interior illumination in the caboose Track Specifications TRACK LAYOUT Builds a 40 inch by 60 inch oval Item Condition and Purchase Advice CONDITION Factory sealed in original shrink wrap. Please review all photos carefully, they are part of the description. Ask any questions before you buy. 130
SHIPPINGS
Free shipping in Spanish mainland, Balearic Islands and Portugal.
For other countries the shipping cost will be paid by the client.
DELIVERY TIME (as of delivery)
Spanish mainland, Balearic Islands and Portugal: 1-2 working days.
Other countries, we attach a table with those that are open in the online store, indicating transporter and transit days.
The return period is 14 calendar days from the receipt of the order.
Carriers for change of size in Spanish mainland, Balearic Islands and Portugal, are in charge of 24HRS.